AI Data Center
Full Lifecycle Services.
Pre-Feasibility → Feasibility → CBA → Design → Build → Support → Training → Software
Rented Racks · In-House Build · New Location — Across 7+ Global Regions
From Pakistan to the UK, Australia, Africa, and Qatar — we deliver the complete lifecycle: feasibility studies, cost-benefit analysis, architectural design, hardware implementation, managed support, training, and custom software development for any AI model or application.
Service Lifecycle
The Complete 9-Stage Lifecycle
Every AI data center engagement follows a structured lifecycle. We can deliver any stage independently or as a full turnkey program.
1Pre-FeasibilityOpportunity & risk scan
2Feasibility StudyTechnical & economic viability
3Cost-Benefit AnalysisTCO, ROI, NPV, IRR
4Design & ArchitectureHLD, LLD, engineering
5ImplementationProcure, build, integrate
6Support & Operations24/7 SLA-backed
7TrainingAdmin & end-user
8Software DevCustom apps & integrations
9OptimisationContinuous improvement
Engagement Flexibility
Engage us for a single stage (e.g., feasibility study only), a phase (design + implementation), or a full turnkey program. Every stage has defined deliverables, acceptance gates, and pricing.
Stage 1 & 2
Pre-Feasibility & Feasibility Studies
STAGE 1
Pre-Feasibility Study
A rapid, low-cost assessment to determine whether an AI data center investment is worth pursuing further.
- Opportunity scan: Business drivers, AI use cases, and demand assessment
- Site shortlisting: Regional options (rented/in-house/new) with high-level power, cooling, and connectivity checks
- Regulatory screening: Data sovereignty, export controls, and local compliance
- Budget envelope: Order-of-magnitude CAPEX and OPEX estimates (±30–50%)
- Risk register: Top 10 risks with probability/impact/mitigation
- Go/No-Go recommendation with a decision framework
Deliverable: Pre-Feasibility Report (20–30 pages) · Duration: 2–4 weeks · Example: A Qatari conglomerate screened 3 regions and eliminated 2 due to grid constraints, saving $80K in wasted design fees.
Target customers: Boards, CFOs, and strategy teams deciding whether to invest.
STAGE 2
Feasibility Study
A detailed technical and economic viability assessment before committing to design and procurement.
- Technical feasibility: Power availability, cooling capacity, floor loading, network latency, and GPU supply chain
- Site readiness survey: Rack space, kW power, cooling headroom, and physical security
- AI workload assessment: Model sizes, concurrency, context windows, and storage requirements
- Regulatory & legal review: Data residency, PDPA/CLOUD Act/GDPR, and export compliance
- Vendor & supply chain assessment: GPU lead times, regional distributors, and refurbished options
- Implementation roadmap: 16–32 week phased plan with critical path
- Class estimate CAPEX/OPEX (±15–20% accuracy)
Deliverable: Feasibility Study Report (60–90 pages) + Financial Model · Duration: 4–8 weeks · Example: A UK fintech's feasibility study revealed London grid delays would push go-live by 14 months; we pivoted to Manchester and saved 10 months.
Target customers: CTOs, infrastructure heads, and project sponsors preparing a business case.
Stage 3
Cost-Benefit Analysis (CBA)
STAGE 3
Cost-Benefit Analysis & Financial Modelling
A rigorous, investor-grade financial model to justify the investment and compare deployment options.
- Total Cost of Ownership (TCO): 5-year and 10-year CAPEX + OPEX across all scenarios
- CAPEX breakdown: Hardware BOM, facility build, integration labor, taxes/duties, contingency
- OPEX breakdown: Colocation, power, cooling, support, warranty, staffing, storage expansion
- ROI / NPV / IRR / Payback Period under base, optimistic, and pessimistic cases
- Scenario comparison: Rented vs. in-house vs. new location; region vs. region
- Currency & sensitivity analysis: USD/PKR/MYR/GBP/AUD exposure and inflation
- Benefit quantification: Productivity gains, risk reduction, compliance value, and revenue enablement
- Financing options: CAPEX vs. OPEX models, lease vs. buy, and tax incentives (MDEC, UK super-deduction, etc.)
Deliverable: Excel Financial Model + CBA Report · Duration: 3–6 weeks · Example: For a South African bank, our CBA showed a 22% 5-year TCO advantage for rented racks in Johannesburg vs. an in-house Cape Town build — NPV positive in Year 3.
Target customers: CFOs, investment committees, and boards requiring a defensible business case.
Sample CBA Output (Illustrative)
| Metric |
Rented Racks |
In-House Build |
New Location |
| 5-Year TCO | $4.1M–$4.8M | $4.3M–$4.9M | $4.5M–$5.2M |
| Deployment Timeline | 16–20 weeks | 24–32 weeks | 30–40 weeks |
| Payback Period | 2.8 years | 3.5 years | 3.9 years |
| NPV (8% discount) | $1.2M | $0.9M | $0.7M |
| IRR | 28% | 21% | 18% |
Figures are illustrative and vary by region, scale, and model mix. Full CBA delivered per engagement.
Stage 4
Design & Architecture
STAGE 4
High-Level Design (HLD) & Low-Level Design (LLD)
Complete engineering documentation for your AI data center — from cluster topology to cable schedules.
- Distributed 5-cluster architecture: API/Orchestration, Vector DB, LLM Inference, ETL, Batch Multimedia
- Network design: 100GbE spine-leaf fabric, zero-trust segmentation, air-gap boundaries
- Memory & storage hierarchy: HBM3e sizing, DDR5 allocation, NVMe hot tier, HDD cold tier
- Power & cooling engineering: kW/rack calculations, liquid vs. air cooling, UPS/generator sizing
- Security architecture: RBAC matrix, audit logging, offline update protocol
- Data sovereignty map: Where data lives, flows, and is backed up
- LLD deliverables: BOM with unit rates, rack layouts, IP schema, cable schedules, commissioning plan
Deliverable: HLD + LLD packages (editable formats) · Duration: 4–8 weeks · Example: Our HLD for a Kenyan fintech specified 8-GPU H200 nodes with direct-to-chip cooling, avoiding a $200K overspend on unnecessary redundancy.
Target customers: Infrastructure architects, construction partners, and procurement teams.
Stage 5
Implementation & Deployment
STAGE 5
Procurement, Build & Integration
End-to-end delivery: hardware sourcing, installation, commissioning, and live integration.
- Hardware procurement: GPU servers, CPU nodes, storage, networking, and software licenses
- Supply chain management: Import handling, customs clearance, SBOM verification, and country-of-origin documentation
- Facility preparation: Racking, power distribution, cooling commissioning, and physical security
- Cluster deployment: All 5 clusters installed, configured, and tested
- MCP connector development: Read-only integrations to 10 enterprise systems
- Data ingestion: ETL pipelines, embedding generation, and vector DB population
- Acceptance testing: Air-gap validation, 50-concurrent-session latency, citation accuracy, RBAC, backup/restore
- Go-live & handover: SLA baseline measurement and formal transition to operations
Deliverable: Commissioned system + Acceptance Test Report + Go-Live Certificate · Duration: 12–16 weeks (post-design) · Example: A Malaysian logistics firm went from contract to production in 18 weeks, integrating 10 legacy systems with zero data loss.
Target customers: Organizations wanting a single accountable partner for the entire build.
Stage 6
Support & Managed Operations
STAGE 6
SLA-Backed Support & 24/7 Operations
Keep your AI platform running at peak performance with proactive monitoring and rapid incident response.
- 8x5 business-hour support (baseline): Remote monitoring, patch management, and quarterly SLA reports
- 24x7 severity-based escalation (optional): Critical incident response with 4-hour SLA
- Hypercare (Weeks 17–20): Enhanced monitoring and weekly status reviews post-go-live
- Offline patch & model updates: Quarterly or as-needed delivery via secure transfer station
- Backup & disaster recovery: Scheduled drills, restore testing, and immutable backups
- Capacity planning: Storage expansion, GPU scaling, and performance tuning
- 99.9% uptime SLA: Proportional service credits applied automatically
Deliverable: Monthly/quarterly SLA reports + 12-month warranty · Example: A Qatari enterprise maintained 99.95% uptime over 12 months with our proactive monitoring and hypercare.
Target customers: Organizations without in-house AI ops teams, or those seeking SLA-backed peace of mind.
Stage 7
Training & Knowledge Transfer
STAGE 7
Admin & End-User Enablement
Build internal competency so your team can operate, maintain, and extend the platform independently.
- Train-the-trainer: 3–5 administrators, 2–3 days on-site
- Operator onboarding: 1–2 days for end-users (50 authorized users)
- Curriculum: System architecture, daily operations, incident escalation, offline update protocol, backup/restore, RBAC administration
- User curriculum: Basic usage, prompt engineering, understanding citations and uncertainty notices
- Documentation package: Architecture diagrams, operations manual, troubleshooting guide, user guide, offline update protocol manual
- Recorded sessions: Walkthroughs of critical procedures for future reference
Deliverable: Training Completion Certificate + Documentation Package + Recorded Sessions ·